Modular switches of ANCHOR ROMA (or) equivalent will be provided.
Three phase supply with concealed wiring will be provided. The actual supply will be single or three phases based on the TNEB rules and regulations at the time of energizing the Villas.
Split A/C provision will be provided in the master bedroom & 2nd bedroom and only pipe provision will be given in 3rd bedroom.
15A plug points will be provided Fridge, Washing machine and geyser in toilets.
The wiring for 5A points will be of 1.0 sq.mm rating adequate for equipment of capacity of 500W and 15A points will be of 2.5sq.mm rating adequate for equipments of capacity of 1500W. AC wiring will be of 4 sq.mm which can take up a capacity of 2 tones.